Technology solutions for your futureWeekdays 08:00–17:000 (414) 312 33 72iletisim@desabilisim.com
Get a Quote
  1. Home
  2. Service areas
  3. Akçakale
  4. Solar power
Solar power in Akçakale

In the irrigated farmland around Akçakale, well pumps are a major electrical load. When planning solar irrigation, the pump’s power and the hours when water is supplied are decisive. The plain is flat and open, so shading is rarely a problem, but there is a lot of dust; panel cleaning should be factored in from the start.

Akçakale

From our office in Karaköprü, about 60 km

What do we do in Akçakale?

  • Rooftop solar systems
  • Ground-mounted installations
  • Grid-connected and off-grid (battery) systems
  • Solar solutions for agricultural irrigation
  • Monitoring and maintenance

Akçakale

  • Akçakale Cultural CenterAll low-voltage systems
  • Akçakale Municipality BuildingAll low-voltage systems
  • Akçakale 32-classroom Imam Hatip High School + dormitoryAll low-voltage systems

Frequently asked

In this district: Security camera · Fire alarm

Do you come to Akçakale for installations?

Yes, we do. From our office in Karaköprü, we serve all districts of Şanlıurfa, including Akçakale. In Akçakale we have already worked on the municipality building, the cultural center and school projects.

Power often goes out at our warehouse on the plain. Will the cameras keep recording?

If the recorder and cameras are connected to a UPS, recording continues through short outages. If outages are long, backup with solar panels and batteries can also be considered. We decide which is needed by looking at how often outages happen and how long they last.

Is solar power efficient in Şanlıurfa?

Şanlıurfa is one of our provinces with high sunshine all year round, which is a good start for solar power. Still, output depends on the roof’s direction, tilt, shade and how clean the panels are. Panels lose some efficiency in the summer heat, and dust also lowers output, so correct placement and regular cleaning matter.

Do you need a permit for a grid-connected solar system?

Yes. For grid-connected systems, you need to apply to your electricity distribution company and get the required approvals. The process follows the Regulation on Unlicensed Electricity Generation in the Electricity Market and related rules. We explain the information and steps needed for the application and stay with you during the preparation.

Desa Bilişim customer representative on the phone

Contact us about solar power in Akçakale

Let us hear about your project, see your place and plan the best system for you together.

Start the quote wizard 0 (414) 312 33 72

Or write to us with the message form.

Weekdays 08:00–17:004.7 · on Google 40 reviews

Leave your number and we will call you as soon as possible during working hours.

Your number is used only to get back to you. KVKK Privacy Notice

Desa Bilişim office

Doğukent, Akşemsettin Blv. No: 4/6A
63340 Karaköprü / Şanlıurfa

Weekdays 08:00–17:00

Which app should we open the directions in?

Call us and we’ll guide you WhatsApp How far are we from you?

May we use your location once?

To work out how far we are from you, your browser will ask for location permission once. The calculation happens only on this device; your location is not sent to us and is not stored.

Call UsGet a Quote